• woodland_detail8
  • woodland_detail1
  • woodland_detail3
  • woodland_detail4
  • woodland_detail5
  • woodland_detail6
  • woodland_detail7

Woodland Trail & Bridge

May 20, 2011
Project
Woodland Trail & Bridge
Client
City of Markham

Scope of Work
Pedestrian bridge installation
Value
$137,000

Challenges
Environmentally sensitive area, dewatering, difficult access and permits

Tasks
Concrete bridge abutments and wing walls, helical piles, lift and install bridge, culvert removal and sediment control

Company Testimonials


  • block12_detail1
  • block12_detail2
  • block12_detail3
  • block12_detail4
  • block12_detail5
  • block12_detail6

Block 12 Bridges & Pathways

November 4, 2011
Project
Block 12 Bridge & Pathway

Client
City of Vaughan

Scope of Work
Community pathway and installation of pedestrian bridges
Value
$365,000

Challenges
Environmentally sensitive area, restricted access and varied terrain

Tasks
3 pedestrian bridges, bridge abutments, coffer dams, asphalt paving, concrete paving, culverts, bollards, clearing and grubbing, grading, terra seeding, planting, topsoil and sod

Company Testimonials


  • 19TH_detail1
  • 19TH_detail2
  • 19TH_detail3
  • 19TH_detail4
  • 19TH_detail5

19th Avenue Bridge Rehabilitation

September 1, 2013
Project
19th Avenue Bridge Rehabilitation
Client
City of Markham
Scope of Work
Rehabilitation of bridge transition decks and structure
Value
$100,000

Challenges
Road closure, permits, engineering

Tasks
Coordination of road closure and signage, concrete removal, installation and compaction of granular, waterproofing, concrete paving and curbs, asphalt paving guard rail repair and line paiting

Company Testimonials


  • tannery_detail1
  • tannery_detail2
  • tannery_detail3
  • tannery_detail4
  • tannery_detail5
  • tannery_detail6
  • tannery_detail7
  • tannery_detail8

Tannery Pond Improvements

September 19, 2011
Project
Tannery Pond Environmental
Client
City of Markham

Scope of Work
Repair and management of natural and man-made structures within the park
Value
$150,000

Challenges
Road closure, permits, engineering

Tasks
Excavation and grading, coffer dams and flow by pass, riffle pools, restoration of river features, vegetation management, river stones, fish rescue and planting

Company Testimonials


  • east_detail1
  • East_detail2
  • East_detail3
  • East_detail4
  • East_detail5
  • East_detail6

East Don River Erosion Control

November 18, 2012
Project
East Don River Erosion Control
Client
City of Markham
Scope of Work
Erosion restoration and bank stabilization
Value
$245,000

Challenges
Environmentally sensitive area, difficult access, steep terrain, sediment control, permits and engineering, traffic and water safety

Tasks
Excavation of eroded river bank, install keystones and rip rap ballast, topsoil and stabilization planting

Company Testimonials


  • rouge-river_detail1
  • rouge-river_detail2
  • rouge-river_detail3
  • rouge-river_detail5
  • rouge-river_detail6
  • rouge-river_detail7
  • rouge-river_detail8

Rouge River Erosion Control

July 19, 2013
Project
Rouge River Erosion Control
Client
City of Markham

Scope of Work
Erosion restoration and bank stabilization
Value
$800,000

Challenges
Environmentally sensitive area, difficult access through private residential property, steep terrain, sediment control, permits and engineering, traffic and water safety

Tasks
Coffer dam construction, excavation of eroded river bank, install keystones and rip rap ballast, place and compact granular material, stone retaining wall, geo-fabric installation, topsoil, sod and stabilization planting, reinstate septic and irrigation system

Company Testimonials


  • corbett_detail1
  • corbett_detail2
  • corbett_detail3
  • corbett_detail4
  • corbett_detail5
  • corbett_detail6
  • corbett_detail7

Corbett Creek Erosion Control

October 10, 2013
Project
Corbett Creek Erosion Mitigation
Client
Town of Whitby

Scope of Work
Erosion restoration and bank stabilization
Value
$136,000

Challenges
Environmentally sensitive area, difficult access, steep terrain, sediment control, permits and engineering, traffic and water safety and existing utilities

Tasks
Remove and replace guardrail, excavation of eroded river bank, install stone buttress and rip rap ballast, geo-textile installation, sediment control, sod, terraseed and stabilization planting

Company Testimonials


  • east-humber_detail1
  • east-humber_detail2
  • east-humber_detail3
  • east-humber_detail4
  • east-humber_detail5
  • east-humber_detail6
  • east-humber_detail7
  • east-humber_detail8
  • east-humber_detail9

East Humber Trail

October 31, 2012
Project
East Humber Trail
Client
Town of Richmond Hill

Scope of Work
Construction of multi surface recreational trail and boardwalk system
Value
$1,700,000

Challenges
Environmentally sensitive area, restricted access, expansive work site, multiple terrain types and water crossings and grand opening deadlines

Tasks
Multi surface trail system, helical piles, observation deck and 4 steel pedestrian bridges, steel framed boardwalks, impressed concrete, asphalt paving, stone seat walls, fencing, site furniture and signage, site drainage, bat boxes and poles, grading, planting, sod and seeding

Company Testimonials


  • CIRCA_detail1
  • CIRCA_detail2
  • CIRCA_detail3
  • CIRCA_detail4
  • CIRCA_detail5
  • CIRCA_detail6
  • CIRCA_detail7
  • CIRCA_detail8
  • CIRCA_detail9

Circa Park Phase 2

August 31, 2013
Project
Circa Park Phase 2
Client
City of Markham
Scope of Work
Construction of a public park
Value
$700,000

Challenges
Close proximity to residences, noise abatement, vehicle and pedestrian safety

Tasks
Grading, area drains and catch basins, sewer, water and hydro service connections, lighting, fencing, limestone pathway, masonry columns, concrete paving and seat walls, site furniture and sculptures, irrigation, planting, topsoil and sod

Company Testimonials


  • willow_detail1
  • willow_detail2
  • willow_detail3
  • willow_detail4
  • willow_detail5
  • willow_detail6
  • willow_detail7
  • willow_detail8

Willow Hollow Park

August 7, 2013
Project
Willow Hollow Park
Client
Town of Richmond Hill

Scope of Work
Construction of a community park
Value
$275,000

Challenges
Intricate grading, schedule coordination and material sourcing

Tasks
Play equipment, engineered wood safety surfaces, timber steps, thermoplastic pavement markings, asphalt paving, concrete paving and curbs, armourstone headwall, sub-drains, site furniture, boulders, grading, planting, terraseeding, topsoil and sod

Company Testimonials


  • vanderburgh_detail1
  • vanderburgh_detail2
  • vanderburgh_detail3
  • vanderburgh_detail4
  • vanderburgh_detail5
  • vanderburgh_detail6
  • vanderburgh_detail7
  • vanderburgh_detail8

Vanderburgh Parkette

September 17, 2014
Project
Vanderburgh Parkette
Client
Town of Richmond Hill
Scope of Work
Construction of a municipal park
Value
$370,000

Challenges
construction deadline, trade coordination.

Tasks
Site preparation and demolition, rough and fine grading, storm sewer servicing, subsurface drainage system, playground equipment, concrete paving and curbs, carpentry, site furniture, pedestrian lighting, planting and sodding.

Company Testimonials


  • DCIM101GOPRO
  • Photo 2
  • Rocking Horse Ranch 11 NOV 2014 b
  • photo 2- 2 OCT 2014
  • Rocking Horse Ranch 2
  • Rocking Horse Ranch 11 NOV 2014 c

Rocking Horse Ranch

August 20, 2015
Project
Rocking Horse Ranch
Client
Town of Richmond Hill
Scope of Work
Construction of a municipal park
Value
$1,000,000

Challenges
construction deadline, trade coordination

Tasks
site preparation, rough and fine grading, storm sewer servicing, subsurface drainage system, asphalt paving, concrete paving and curbs, permeable pavers, double tennis courts, basketball court, playground and exercise equipment, shade structure, fencing, lighting, armourstone, furniture, thematic elements, planting, seeding and sodding

Company Testimonials


  • East Point footings
  • East Point foundations
  • East Point foundation backfill
  • East Point steel lift
  • East Point panel lift
  • East Point structure
  • East Point side view structures
  • East Point entry sign
  • East Point detail

East Point Bird Sanctuary

August 21, 2015
Project
East Point Bird Sanctuary
Client
T.R.C.A
Scope of Work
Construction of Shelters and Bird Blind
Value
$600,000

Challenges
sensitive environment, access, flooding, component integration

Tasks
Fabrication and installation of landscape and architectural elements including shredded bark paths, stabilized aggregate, granular drainage, concrete footings and foundation walls, laser cut weathering steel walls of text and bird shapes, roof structure, railing and posts, custom-fabricated steel floor grating, community bulletin board, faceted armourstone benches, precast concrete benches, seeding and site restoration

Company Testimonials


  • Major Wood grading
  • Major Wood play equip
  • Major Wood concrete
  • Major Wood paving
  • Major Wood roof lift
  • Major Wood structure
  • Major Wood play area
  • Major Wood path
  • Major Wood entry
  • Major Wood tennis
  • Major Wood rubber
  • major wood aerial 2
  • major wood aerial

Major Wood Catherdraltown Park

August 21, 2015
Project
Major Wood Cathedraltown Park
Client
City of Markham
Scope of Work
Construction of a municipal park
Value
$1,500,000

Challenges
construction deadline, trade coordination

Tasks
Large volume earthworks, clearing, grubbing and rough grading, sub-drainage, concrete paving and curbs, stone masonry, asphalt, tennis courts and tennis court fencing, playground and fitness equipment, rubber surfacing, shade structure, electrical lighting, site furnishings, topsoil and finish grading, planting, sodding

Company Testimonials


  • Culvert 5
  • Culvert 7
  • Culvert 6
  • Culvert 3
  • Culvert 4
  • Culvert 10
  • Culvert 8
  • Culvert 1
  • Culvert 2
  • Culvert 9

Culvert Rehabilitaion

August 21, 2015
Project
Culvert Rehabilitation
Client
City of Markham
Scope of Work
Rehabilitation of 7 municipal culverts
Value
$800,000

Challenges
access, confined space, environmentally sensitive, water management, traffic control, seasonal deadlines

Tasks
Stream diversions, dewatering, erosion control and bank stabilization, fish rescue, debris and sediment removal, concrete removal and restoration, new culvert linings, grouting, rockworks, railings, seeding

Company Testimonials


  • Highland Creek 1
  • Highland Creek 2
  • Highland Creek 3
  • Highland Creek 4
  • Highland Creek 5
  • Highland Creek 6
  • Highland Creek 7
  • Highland Creek 8
  • Highland Creek 9
  • Highland Creek 10
  • Highland Creek 11

Highland Creek Bioswale

August 21, 2015
Project
Highland Creek Bioswale
Client
Scope of Work
Construction of a bioswale for storm water runoff
Value
$58,000

Challenges

Tasks
Excavation and grading, drainage, riverstone swale, armourstone tiers, concrete curbs, asphalt patching, planting, topsoil and sod

Company Testimonials


  • Oak Ridges Meadow June 26 2015 2
  • Oak Ridges Meadow NH 23 JUL 2015 3
  • Oak Ridges Meadow NH 23 JUL 2015 2
  • Oak Ridges Meadow 23 OCT 2015 NH 2
  • Oak Ridges 15 OCT 2015 NH 7
  • Oak Ridges 15 OCT 2015 NH 6
  • Oak Ridges 15 OCT 2015 NH 3
  • oak ridges boardwalk
  • oak ridges meadow aerial

Oak Ridges Meadow Park

December 10, 2015
Project
Oak Ridges Meadow Park
Client
Town of Richmond Hill
Scope of Work
Redevelopment of a municipal park
Value
$450,000

Challenges
construction deadline, trade coordination

Tasks
demolition and removals, erosion and silt control, grading, sub-drains and culverts, limestone pathways, elevated boardwalk with helical piers, concrete curbs and paving, armourstone, granite boulders, engineered wood safety surfacing, play equipment, thematic features, site furniture and signage, planting, topsoil and sod

Company Testimonials


  • May 22 2015 JB 3
  • May 22 2015 JB 1
  • Box Grove 2 SEP 2015 JM 1
  • Box Grove JM 8 JUL 2015 4
  • Boxgrove June 11 2015 JB
  • Box Grove JM 8 JUL 2015 2
  • box grove aerial
  • aerial box grove 2

Boxgrove Community Centre

December 10, 2015
Project
Boxgrove Community Centre
Client
City of Markham
Scope of Work
Construction of a municipal park
Value
$290,000

Challenges
construction deadline, trade coordination

Tasks
clearing and grubbing, tree removal, site grading, sub-drainage, asphalt paving, concrete paving and curbs, play equipment, rubber safety surfacing, site furniture, planting, topsoil and sod

Company Testimonials


  • lower rear patio 11
  • lower rear patio 8
  • lower rear patio 6
  • lower rear patio 7
  • lower rear patio 5
  • lower rear patio 1
  • lower rear patio 2
  • lower rear patio 3
  • lower rear patio 4
  • lower rear patio 12
  • lower rear patio 10
  • lower rear patio 9

Lower Rear Patio Renovation

December 11, 2015
Project
Lower Rear Patio Renovation
Client
Y.C.D.S.B
Scope of Work
Construction of courtyard patio
Value
$95,000

Challenges
limited access, minimizing disturbance to staff

Tasks
demolition of existing lower patio, area drains and sub-drainage, catch basin maintenance hole and storm sewer outfall, concrete curbs and heavy-duty paving, planting, topsoil and sod

Company Testimonials


  • Carruthers 1
  • Carruthers 3
  • Carruthers 2
  • Carruthers 4
  • Carruthers 5
  • Carruthers 6
  • Carruthers 7
  • Carruthers 8

Carruthers Trail

September 13, 2017
Project
Carruthers Trail
Client
Town Of Ajax
Scope of Work
Construction of multi-use trail
Value
$1,725,000

Challenges
difficult access, engineering challenges

Tasks
excavations and removals, grading, culverts, bank stabilization, armourstone, concrete shore wall and abutments, helical piles, pedestrian bridge and boardwalks, steel pergola, fitness stations, asphalt paving, planting, topsoil and sod

Company Testimonials


  • Markham MUP 10
  • Markham MUP 15a
  • Markham MUP 11
  • Markham MUP 12
  • Markham MUP 14
  • Markham MUP 15
  • Markham MUP 9
  • Markham MUP 8
  • Markham MUP 5
  • Markham MUP 6
  • Markham MUP 7
  • DCIM112GOPRO
  • DCIM112GOPRO
  • DCIM112GOPRO
  • Markham MUP 17
  • Markham MUP 1
  • Markham MUP 16

Markham Multi-Use Pathway

November 1, 2017
Project
Markham Multi-Use Pathway
Client
City of Markham
Scope of Work
Construction of multi-use trail
Value
3,000,000

Challenges
difficult access, traffic and pedestrian control, engineering challenges

Tasks
excavations and removals, grading, culverts, bank stabilization, armourstone, concrete abutments, helical piles, pedestrian bridges and boardwalks, corten steel signage, asphalt, concrete and granular paving, solar lighting, fencing, furniture, planting, topsoil, seeding and sod

Company Testimonials


  • baif 2
  • baif 10
  • baif 1
  • DCIM100MEDIADJI_0212.JPG
  • DCIM100MEDIADJI_0211.JPG
  • DCIM100MEDIADJI_0214.JPG
  • DCIM100MEDIADJI_0209.JPG
  • DCIM100MEDIADJI_0213.JPG

Baif Pond Boardwalk

November 2, 2017
Project
Baif Pond Boardwalk
Client
Town of Richmond Hill
Scope of Work
Construction of boardwalk in wetland area
Value
$240,000

Challenges
environmentally sensitive area, difficult access

Tasks
sediment control, helical piles, concrete abutments, carpentry, restoration

Company Testimonials


  • Jaycee 1
  • Jaycee 2
  • Jaycee 3

Jaycee Park

November 3, 2017
Project
Jaycee Park
Client
City of Mississauga
Scope of Work
Construction of public park
Value
$826,000

Challenges

Tasks
demolition and removals, excavation and grading, drainage improvements, concrete paving, concrete curbs and seat walls, rubber safety surfacing, engineered wood safety surfacing, sand pit, custom play features and equipment, site furniture, planting, sod

Company Testimonials